美女的隐私尿口无遮图片-美女的隐私免费高清视频-美女的隐私蜜桃传媒免费看-美女的下部隐私网站99-369看片你懂的-360大奶网

Preparation for sheet metal deburring and chamfering! Shengxingli mechanical deburring machine series

Source:Jinhua Shengxingli Machinery Manufacturing Co., Ltd.Release time:2024-07-17

Sheet metal chamfering is a common process in machining, its purpose is to remove the burr on the edge of the part and improve the smoothness and beauty of the part. The use of chamfering machine is of great significance to improve production efficiency and processing quality. This article will introduce the sheet metal chamfering test process in detail to ensure the normal operation of the equipment and the safety of production.

Before the sheet metal chamfering test machine, you need to make the following preparations:

1. Check the equipment: ensure that the chamfer is in good working condition, including whether the power supply, air pressure, lubrication and other systems are normal.

2. Prepare tools: Prepare the required tools and measuring tools, such as cutting tools, fixtures, measuring ruler, etc.

3. Clean up the site: Clean up the work area to ensure that there is no debris and garbage.

4. Understand drawings: familiar with sheet metal drawings, understand the size, shape and material of parts and other information.

Second, the test process

1. Start the device: Turn on the power supply and air pressure system to ensure the normal operation of the device.

2. Install abrasive: Select the appropriate abrasive according to the size and shape of the part, and install it on the knife holder of the chamfering machine.

3. Adjust parameters: According to the material and processing requirements of the parts, adjust the parameters of the equipment, such as feed speed, cutting depth, etc.

4. Test cutting: During the test cutting process, observe the cutting situation, check whether the tool is suitable and whether the equipment is running normally.

5. Measure the size: After the test cutting, use the measuring tool to measure the size of the parts and check whether it meets the requirements of the drawing.

6. Adjust parameters: Adjust the parameters of the equipment according to the measurement results to ensure the processing quality of the parts.

7. Repeat test machine: repeat the above steps until the processing quality of the parts meets the requirements.

Third, precautions

1. In the process of testing, always pay attention to safety to avoid accidents.

2. When adjusting parameters, adjust according to the actual situation, do not blindly pursue processing efficiency and ignore processing quality.

3. When measuring parts with a measuring tool, ensure the accuracy and reliability of the measuring tool.

4. In the process of grinding, it is necessary to keep the sharpness and stability of the abrasive to avoid breaking or sticking.

5. In the use of chamfer, regular maintenance and maintenance should be carried out to ensure the normal operation and service life of the equipment.

In short, the sheet metal chamfering test process is an important link to ensure the normal operation of equipment and production safety. In the process of testing the machine, it is necessary to make preparations carefully, strictly abide by the operating procedures, pay attention to safety matters and solve problems in time. Only in this way can we improve production efficiency and processing quality, reduce costs and ensure that the quality and safety of products meet the requirements.

主站蜘蛛池模板: 天天干夜夜添| 用力....cao死我| 伊人久久大香| 亚洲日韩精品欧美一区二区一 | 午夜亚洲WWW湿好爽| 久久机热视频免费| 久久777国产线看观看精品卜| 精品日韩二区三区精品视频| yin荡体育课羞耻play双性| 一级做α爱过程免费视频| 性做久久久久久久| 视频一本大道香蕉久在线播放| 午夜精品久久久久久久| 色啦啦影院| 日韩美女在线视频网站免费观看| 最新在线黄色网址| 亚洲阿v天堂在线2017| 日本亚洲电影| 欧美 国产 日产 韩国 在线| 九九在线精品亚洲国产| 老熟人老女人国产老太| 女的把腿张开男的往里面插 | 狠狠干狠狠色| 久久综合电影| 久久是热这里只有精品| 黄片在线观看| 韩国女主播内部vip自带氏巾| 久久精品无码一区二区日韩av| 免费国产麻豆传| 久久久精品成人免费看| 女人爽得直叫免费视频| 日韩高清特级特黄毛片| 秋霞电影在线观看午夜伦| 免费国产在线观看| 免费人成在线观看视频不卡 | 伊人精品视频| 乌克兰黄色录像| 无限韩国视频免费播放| 天天综合天天影视色香欲俱全| 亚洲国产免费| 在线观看视频网站|